National Institutes of Health
Bethesda, Maryland
The National Institutes of Health has been a continuous client since 1996 for a wide range of engineering services at campuses including Bethesda, Baltimore, Poolesville and off-campus facilities in Rockville. Project experience and specific areas of expertise include wet and dry labs, research support and prep spaces, offices, critical care suites, nuclear medicine radiology centers, animal care facilities, data centers, office spaces and other specialty spaces. Many have been studies and designs supporting infrastructure upgrades and replacements — including the replacement of three AHUs serving critical operating rooms in the Building 10 ACRF. Of more than 100 projects, lab renovations and upgrades have included the following projects:
BUILDING 4
First Floor & Basement Lab Renovations
BUILDING 8
Mass Spectrometer Installations, Third Floor BSL2 Labs
Mass Spectrometer Installations, Fourth Floor BSL2 Labs
8A 1A Lab Renovations
Install NMRs on B2 and Fourth Floor Levels
B1 & B2 Level Lab Renovations
BUILDING 10
F-Wing Relocation of Labs and Offices
J-Wing Genome Labs Renovation
CRC Chemical Fume Hood Replacements
Nuclear Medicine Radio-Pharmacy Renovation
NIDCR Fifth Floor Lab Renovation
Pathology Laboratory HVAC Upgrade
NIDCR Electrophysiology Lab Renovation
NCI Fourth Floor Lab Renovations
Microinjection and Fly Kitchen Renovation
Nuclear Medicine Radiology Renovation
Old Patient Kitchen Renovation
NIAD 2EN, 6FN, & 11D Lab Renovations
CRC Renovation of Interaction Areas
12N Lab Renovation
6N Lab Renovation
5C Eye Clinic Renovation
7C, 7N, 9C Lab Renovations
8N & 8D Lab Renovations
Pathology Laboratory Study
BUILDING 14
Animal Lab Cage Wash Studies
BUILDING 33
2E-13B Microscope Rooms Upgrades
BUILDING 35
Electron Microscope Lab Study
35A, Lab Mass Spectrometer Installation
BUILDING 36
1A & 1C Lab Renovations
BUILDING 37
Fifth Floor, Wickner Lab Renovation
BUILDING 41A
BL4 Lab HVAC Upgrade
BUILDING 49
7T Animal Magnet Relocation
Lab Pet Scan Accommodation
Fume Hood Installations
Fourth Floor Lab Renovations
Lab 3C28 Renovation
6A Lab Renovation
BUILDING 50
Room 3332 Laser Lab Renovation
B1 Microscope Room Renovation
X-Ray Crystallography Lab Renovation